News & Projects

Adding beauty and
structure to
everything we touch

Pedestrian bridge

B2B 5K Run

Raštelica 2 Bridge

Golubinja 1 Bridge

Marjanović Draga Viaduct

Viaduct on Interchange

Viaduct Jelovik

OUR REFEreNCES

2023

Infrastructure
Arrow
  • Preliminary and Main design of the viaduct Miloševac at Adriatic-Ionian highway
  • Preliminary and Main design of the bridge Svrake
  • Main design of the bridge No. 3 at the Nević   – Turbe expressway section
  • Design of the scaffolding and formwork of the superstructure for the Bosut bridge in Croatia
  • Bridge rehabilitation design over a steep slope Babin zub in Sarajevo at the main road M5
  • Regular inspection of bridges on regional roads in HNK, City of Konjica – kat. 2 & 3
  • Detailed design of the bridge #10 (O30) and culverts P57, P57A i P58 at the Banja Luka – Prijedor motorway section
  • Detailed design of the bridges Usora 2 & Usora 3 at the Putnikovo brdo – Medakovo motorway section
  • Main design for rehabilitation of the bridge M18-007-81 over river Gostelja at main road M18, section Živinica 1 – Vitalj, ch. 13+256 with relocation of the route
  • Preliminary and main design for the reconstruction of the bridge and the regulation of the river Lašva in Gladnik
  • Geological geotechnical research project and the main landslide rehabilitation design in Donji Kakanj
  • Preliminary and main design for the bridge Prača at the Prača – Goražde expressway section
  • Main design of the underpass and local road at ch. u km 8+530 of expressway Lašva – Nević Polje
  • Main design of pedestrian underpass at ch. 2+145 at the Putnikovo brdo – Medakovo motorway section
  • The reconstruction project of the bridge over the Željeznica river in Ilidža
  • Main and detailed design for the overpass Bedaci at the Putnikovo Brdo – Medakovo motorway section
  • Main and detailed design for the bridges Tešanjka 1 i Tešanjka 2 at the Putnikovo Brdo – Medakovo motorway section
  • Main design for the bridge M4a at the Mostar north – Mostar south motorway section
Industrial facilities and Building constructions
Arrow
  • Rehabilitation design of silos foundations in Zenica at the location of the company Istrabenz Plini
  • Main design for the floor reconstruction in the building PM1 at the Natron Hayat Maglaj pulp and paper factory
  • Main design (construction and architecture phase) for the ALATNICA production facility in the industrial zone of Bekto Preciza in Goražde
  • Main design for road and drainage at the GMC factory in Usora
  • Main and detailed design for installation of equipment at the SJEKAONA facility in Natron Hayat Maglaj pulp and paper factory
  • Main and detailed design for the modification of the vacuum system in the PM4 facility in Natron Hayat Maglaj pulp and paper factory
Consulting and Supervision
Arrow
  • Consulting services for the general contractor for the construction of the residential and commercial building Roof Gardens at the Trebević mountain near Sarajevo
  • Supervision services of the wind power plant Ivan Sedlo
  • Study on the maintenance of the bridge Ostrožac

2022

Infrastructure
Arrow
  • Design of noise protection walls at the Tarčin – Ivan motorway section
  • Preliminary and main design of a loacal road in Bačići Street with a sidewalk 330 meters long
  • Main design of the retaining wall in the length of 45 m in Sulejman Paćariza – Hodže Street
  • Geotechnical study and main design of the road with a retaining walls for access to the clinic in Umihana Čuvidina Primary School
  • Geological geotechnical research and the main landslide rehabilitation design in Donji Kakanj
  • Detailed design of retaining walls on the connecting road between the M17 and the Počitelj interchange
  • Detailed design of the M3 bridge at the Počitelj – Zvirovići motorway section
  • Design supervision in the construction of the Marjanović Draga viaduct
  • Main design for the rehabilitation of the bridge over Bregava river in Stolac at the main road M17.3
  • Preliminary, main and detailed design for the viaduct #1, viaduct #2 and viaduct #3 at the Vranduk – Ponirak motorway section
  • Main design for the bridges 1, 2 and 3 at the Šicki Brod – Morancani expressway section
  • Main design for the reconstruction of the bridge over the Kalašnica River for the village of Smucka in Tarčin
  • Inspection of bridges for priority rehabilitation for the Ministry of Transport and Communications HNK
  • Main design for the reconstruction of three bridges over the Bastra river on the main road M4.3 Bužim – Bos. Otoka
  • Main design for the reconstruction of the bridge over the Ljubina river in Semizovc, main road M18
  • Detailed design of noise protection walls on the Bugojno bypass
Industrial facilities and Building constructions
Arrow
  • Design of the hazardous material and chemical warehouse in Natron Hayat Maglaj pulp and paper factory
  • Rehabilitation design of Kuhaona facility in Natron Hayat Maglaj pulp and paper factory
  • Rehabilitation design of PM4 facility in Natron Hayat Maglaj pulp and paper factory
  • Main and detailed design of the Bradina toll station
  • Main and detailed design of the Roel residential building in Germany
Consulting and Supervision
Arrow
  • Consulting services of the general contractor for the construction of the residential and commercial building Roof Gardens in Trebević
  • Supervision of the construction of the residential building K11 in the Kromolj in Sarajevo
  • Study of the load capacity of the existing bridges on the main road M17 from Doljani to Ivan
  • Consulting services for the Ostrožac suspension bridge
  • Supervision of the rehabilitation of the regional road R437 Kospina Luka – Dzanici
  • Supervision of the rehabilitation of the Arapovići bridge on the regional road R435 Konjic – Borci

2021

Infrastructure
Arrow
  • Main design for reconstruction of the bridge over Kolina river in Ustikolina on the main road M20
  • Main design for reconstruction of the bridge over Odska river in  Mravinjac on the main road M20
  • Preliminary design for reconstruction of the Alija Izetbegović bridge over Vrbas river in Donji Vakuf
  • Preliminary, main and detailed design for the bridges Golubinja 1, Golubinja 2, Bosna and Željeznica as well overpass Kovanići at the Poprikuše – Nemila motorway section
  • Main and detailed design for 4 bridges and underpasses at the Vlakovo – Mostarsko raskršće expressway near Sarajevo
  • Detailed design of a temporary bridge over Sava River in the Karavanke tunnel in Slovenia. 
  • Main design of rehabilitation for the bridge over Jale river in Simin Han
  • Main and detailed design for the M2 bridge at the Počitelj – Zvirovići motorway section
  • Main and detailed design for M2 bridge over Vrbas River in Donji Vakuf
  • Main design for reconstruction of the bridge over Drinjača River in Gojsalići 
  • Main design for reconstruction of the bridge over the deep valley on Komar at M5
  • Main design of the R2 roundabout on the Donji Vakuf Bypass
  • Conceptual design of the pedestrian bridge over Trebišnjica River in Trebinje
  • Main design for reconstruction of the Alija Izetbegović bridge over Vrbas River in Donji Vakuf
  • Preliminary design of the viaducts at the end of sector 7 at the Vranduk – Ponirak motorway section
  • Detailed design for the Kostajnica bridge at the Doboj bypass
Consulting and Supervision
Arrow
  • Supervision of construction works at the Tarčin – Ivan motorway section

2020

Infrastructure
Arrow
  • Modification of the main design for the bridge over the Bunta river in Gračanica, on the main road M16.1, Bugojno 2 – Gornji Vakuf 
  • Main design for the bridge Veliki Ibarac at the Rožaje bypass in Montenegro
  • Main design of underpasses and hydrotechnical structures at the Medakovo – Ozimica motorway section
  • Detailed design of bridges Usora 1, Usora 2 and Usora 3 at Putnikovo brdo – Medakovo motorway section
  • Main design for rehabilitation of the road R481 Konjsko – Klanci – Drežnica 
  • Main design for reconstruction of the bridge over Željeznica River in Ilidža, on the main road M17
  • Main design for reconstruction of the bridge over Babin stream, on the main road M5
  • Main design for the overpass in km 1+860 and the underpass in km 3+420 on the Cazin bypass
  • Main and detailed design for the bridge Raštelica 2 at Tarčin – Ivan motorway section
  • Preliminary design of the bridge over Jale River in Simin Han
  • Preliminary and main design for bridge over Vrbas River in Zdaljevac
Industrial facilities and Building constructions
Arrow
  • Main construction design for the revitalization of the Sisak bitumen plant
Consulting and Supervision
Arrow
  • Supervision of construction works at  Klopče – Donja Gračanica motorway section and expert support on D. Gračanica – Zenica tunnel motorway section
  • Supervision of construction works at the Tarčin – Ivan motorway section

2019

Infrastructure
Arrow
  • Scaffolding design for bridges at the section highway Gruškovje – Maribor in Slovenia
  • Technical support on the replacement of the steel ring of the rotary furnace at Natron Hayat
  • Detailed design for the bridge over Vogošća River in the new Industrial Zone
  • Study on the change in the foundation conditions of the bridge over the Sava River in Bosanski Šamac on the M17 road
  • Detailed design of bridges Donja Gračanica, Jelovik, Bosna and viaduct on interchange, motorrway section Donja Gračanica – Tunel Zenica
  • Main design of bridge „Drecelj“ over Neretva river in Konjic
  • Main design of bridge over river Liješnica for entrance in Natron – Hayat industrial plant
  • Preliminary design of „Bravnice“ bridge on M5 road
  • Technical supprot for design of the bridge 5-04 over river Savinja (Slovenia)
  • Technical support for design Technical support for design of retaining structures on section Hrastnik – Zidani most (Slovenia)of overpass 4-3 on highspeed motorway H3, section Ljubljana – Nove Jarše
Industrial facilities and Building constructions
Arrow
  • Main design and construction supervision works of temporary supporting structure for heavy lifting of „MIN Niš“ crane in Natron-Hayat
  • Main structural design for reconstruction of frame type foundation for vibrating machines (turbo blower and induction motor) in Mittal Steel Zenica
Consulting and Supervision
Arrow

Supervision of construction works at  Klopče – Donja Gračanica motorway section and expert support on D. Gračanica – Zenica tunnel motorway section

...

Projects implemented prior the establishment
Arrow
Infrastructure
  • Main design of motorway section Drivuša – Bilješevo on corridor Vc in Bosnia and Herzegovina, 2009
    • Viaduct „Bilješevo“ L=230m
    • Underpass „Lučani 1“
    • Underpass „Lučani 2“
  • Main design of the Corridor Vc in Bosnia and Herzegovina, section Svilaj – Odžak
    • Overpass at km 1+400 L=82m
    • Overpass at km 5+650 L=145m
    • Overpass at km 7+500 L=82m
  • Main design of the Corridor Vc in Bosnia and Herzegovina, section Johovac – Doboj Jug
    • Bridge „Usora 1“ L=278m
    • Bridge „Usora 2“ L=20+2×24+5×30+24=242m
    • Bridge „Usora 3“ L=102m
    • Viaduct „Putnikovo Brdo“ L=290m
    • Bridge „Rudanka“ L=328m
    • Bridge „Kraševo“ L=222+34+22=78m
    • RC arch overpass „Prisade“ L=56m
    • Bridge “Lukavička rijeka” L=24+30+24=78m
  • Main design of high speed motorway Lašva – Donji Vakuf, section Lašva – Nević Polje, 2011 – 2012
    • Bridge „Dubravice“ L = 24 + 6 × 30 + 24 = 228m
    • Bridge „Kaonik 1“ L=27 + 3×34 + 27=156m
    • Bridge “Kaonik 2” L=30+2×34+27=125m
    • Bridge “Bila” L=27+6×34+27=258
    • Bridge “Pečuhe” L=21+23+21=65m
    • Bridge “Most Mali Mošunj” 1 L=24+4×30+24=168m
    • Bridge “Mali Mošunj 2” L=27+34+27=88m
    • Bridge “Nević Polje” L=24+3×30+24=138m
    • Bridge “Vraniska Rijeka” (10.30m),
    • Underpass “Šafradinovo selo” (9m)
    • Bridge „Stara Bila 1“ L=30m
    • Bridge „Stara Bila 2“ L=30m
    • Bridge „Stara Bila 3“ L=30m
    • Bridge „Nova Bila“ L=32m
  • Main design of motorway on corridor Vc in Bosnia and Herzegovina, section Tarčin – Konjic, 2012
    • Viaduct “Podhrastovi” L=50+95+125+90+50=405m
    • Viaducta “Kanjina 1” L=43+6×54+43=410m
    • Vijadukta “Kanjina 2” L=75+125+75=275m
    • Viaduct „Zukići 2“ L = 45 + 3 × 50 + 45 = 240m
    • Viaduct „Vrbljani 1“ L=35 + 7×50 + 35=420m
    • Viaduct „Vrbljani 2“ L=40 + 3×50 + 40=230 m
    • Viaduct „Galjevo 1“ L=29+45+3×50+45+32=301m
    • Viaduct „Donje Selo“ L=32+40+2×50+40+30=240m
    • Underpass “Cerići” 37m
    • Overpass “Vrbljani” 46m
  • Detailed design of the viaduct “Pavlovići” the motorway section Zvirovići – Kravice, 2012 – 2013, L = 33 + 7 × 43 + 33 = 367m
  • Main design of aquaduct for Portillo canal, crossings 0 and 2, Chille 2013
  • Motorway section Butile – Vlakovo, 2013
    • Main design of the viaduct „Bojnik“ L = 20 + 3 × 25 + 20 = 115m
    • Main desing of overpass „Treševine“ L = 47m
  • Main design of Motorway on corridor Vc, section Počitelj – Zvirovići, 2014
    • Detailed design of Bridge “Počitelj” L=105+5×147+105=945m
  • Preliminary design of motorway Tuzla – Žepče, 2015
    • Bridge “Dragovac”, L=29+37×16+29=650m
    • Bridge “Krajnići”, L=36+45×15+36=747m
    • Bridge “Krivaja”, L=36+40×12+36=552m
    • Bridge “Veresika”, L=37+42+46×6+40×10+37=792m
  • Detailed design of bridges on Brčko Bypass, 2015 – 2016
    • Bridge „Gredice“ L=25.6+3×32+25.6=147.2m
    • Bridge „Zmajevac“ L=25.6+3×32+25.6=147.2m
    • Bridge „Pruga“ L= 23.75+9×29.30+23.75 = 311.20m
    • Overpass „Kobilić“ L=12 + 16 + 12 = 40m
    • Bridge „Blizna“ L= 25,6+7×32+25,6=275,2m
    • Bridge „Greda“ L=25.6+32+25,6=83,2m
    • Bridge „Tadići“ L=25.6+32+25,6=83,2m
  • Main design of bridges on motorway Podgorica – Mateševo, 2016
    • Design of bridge „Krkor“ L=35+6×44+35 = 334 m, L=35+5×44+35 = 290 m
    • Design of bridge „Suvovara“ L=22+5×28+22 = 184 m, L=22+7×28+22 = 240 m
    • Design of bridge „Gornje Mrke“ L=22+28×9+22=296m
  • Main design of the bridge “Marijanovića Draga” in South Bypass of Mostar L= 57.5 + 85 + 57.5 = 200m, 2017 – 2018
  • Preliminary design and studies at Mostar south – Buna motorway section on corridor Vc in Bosnia and Herzegovina, 2017 – 2018
    • Bridge „Buna“ L=27+8×34+27=326m
    • Bridge „Brijeg“ L=27+6×34+27=258m
    • Overpass „Mostar“ L=2×21=42m
    • Overpass „Airport“ L=42,60m
    • Overpass „Rujevice“ L=44m (arch RC structure)
    • Bridge „Bunica“ L=30+4×38+29=211m
    • Bridge „Rotimski potok“ L=88+134+88=310m, L=98+134+98=330m
  • Preliminary design and studies at Poprikuše – Nemila motorway section on corridor Vc in Bosnia and Herzegovina, 2017 – 2018
    • Bridge „Golubinja 1“ L=23+29+36,5×10+35+24,5m = 476,5m, L=23+29+7×36,5+29×2+23 = 388,5m
    • Bridge „Golubinja 2“ L=4+3×30+24=138m
    • Bridge „Golubinja 3“ L=29 + 36.5 + 29 = 94.5m
    • Bridge „Bosna“ L=28.0+35.0×10+28.0 = 196.0m
    • Overpass „Kovanići“ L=18 + 20 + 22 + 22 + 20 +18 = 120m, L=18 +20 +20 +20 + 20 +18 = 116m
  • Main design of bridges on motorway Podgorica – Mateševo, 2017 – 2018
    • Design of bridge „Lutovo“ L=22+6×28+22 = 212 m,L=22+3×28+22 = 128 m
    • Design of bridge „Ratkov Laz“ L=22+11×28+22 =352 m, L=22+10×28+22 =324 m,
    • Design of bridge „Đurićev Laz“ L=22+11×28+22 =352 m,L=22+10×28+22 =324 m
  • Main design of bridges on the North Bypass Grude, BiH, 2018
    • Bridge M1 L=14+2×17+14=62m
    • Bridge M2 L=17+2×20+17=74m
  • Preliminary design of bridges and viaducts on motorway Lasva-Nević Polje-Jajce, section Nević Polje-Travnik-Turbe-Jajce jug
    • Bridge M10 L=24+7×30+24 = 258m
    • Bridge M11 L=24+10×30+24 = 348m
    • Bridge M12 L=24+5×30+24 = 198m
    • Bridge M14 L=25,6+2×32+25,6 = 115,2m
    • Bridge M15 L=27+11×34+27 = 666 m
  • Preliminary design of overpass on motorway Lasva-Nević Polje-Jajce, section Nević Polje-Travnik-Turbe-Jajce jug, 2018
    • Overpass NP1 L=19+3×24+19=110m
    • Overpass NP2 L=24+30+24 = 78 m 
    • Overpass NP3 L=24+30+24 =78m
    • Overpass NP4 L=24+30+24 =78m,
    • Overpass on the interchange Travnik L=25,6+32+25,6 = 83,2 m
  • The Main design of the overpass “Mahala” in Bypass of Golubovci, Podgorica, Montenegro L=20+20=40m, 2018
  • The Main design of the bridge over the river Vogošća L=20m, Vogošća, BiH, 2018
  • Technical supprot for review of bridge over river Trebišnjica on Trebinje bypass

 

Industrial facilities and Building constructions
  • Main design of upper and lower station of Trebević ropeway, 2017
  • Acces ramp C3 level at podium S1(Hotel Hilton), Mecca, Kingdom of Saudi Arabia, 2017
  • Renovation of villa Amna, Abu Dhabi, UAE, 2016
  • Al-wathba North mosque, Abu Dhabi UAE, 2016
  • Traffic maintenance and control center at interchange Kaonik and , highspeed motorrway Lašva – Nević Polje, 2014
  • Toll station „Vitez“ and „Nević Polje“, highspeed motorrway Lašva – Nević Polje, 2014
  • Toll station „Kakanj“, motorway at corridor Vc, section Zenica – Sarajevo, 2012
  • Traffic maintenance and control center „Drivuša“, motorway at corridor Vc, section Zenica – Sarajevo, 2010
  • Closed acceptance center for irregular migrants, 2007
  • Toll station „Jošanica“, motorway at corridor Vc, section Zenica – Sarajevo, 2007

 

Consulting and Supervision
  • Supervision of the construction of LOT 2 of Sarajevo bypass
  • Supervision of the construction of the Lepenica – Tarčin highway, section Lepenica – Suhodol