2026

Ljubina Bridge

Rehabilitation of the Existing Composite Steel–Concrete Bridge

Completed project
';

The Designer has been assigned the task of preparing technical documentation for the rehabilitation of the bridge over the Ljubina River, which was severly damaged due to poor maintenance of the Bridge.
The rehabilitation project retains the existing bridge width of 9.0 m and introduces improved structural detailing and bridge equipment. Special attention is given to the new expansion joint solution and transition slabs, which prevent water leakage onto the bearings and increase the durability of the anti-corrosion protection of the main and cross girders.