2022

Raštelica 2 Bridge

Bridge Raštelica 2 is counting less than 1 month till opening. Only part of finishing works have left and testing the bridge under static and dynamic load. Bridge with 19 spans and total length L=606m (586m) was constructed “span by span” on fixed scaffolding as a concrete post tensioned structure. Construction because of tough winter conditions lasted for 2 years. Together with bridge Raštelica 1 and tunnel Ivan, bridge Raštelica 2 is capital structure on Tarčin – Ivan motorway section that is going to be opened next month.

Completed project
';