Raštelica 2 bridge

Support and Contact

info@infra.ba
+387 33 878 247

Raštelica 2 bridge at the Tarčin – Ivan motorway section, with a total length of L = 606m (586m) and a characteristic span of 34m (32m) is under construction, as a reinforced concrete prestressed structure with a “span by span ” technology method. While substructure works are mainly completed, superstructure is on 5th (4th) segment. The main design of the bridge was prepared by Divel during 2011, while the detailed design of the bridge was prepared by Infra Ltd Sarajevo in 2020. Main contractor is EA Sarajevo with subcontractors Vektor – Inetgra and Diorit.


SHARE